For more information regarding Lindner walls and suspended ceilings, please click HERE or the logo below.
Opens a new browser window.

     

We're confident about
the strength of our flooring.

Click the above image for enlarged view.

REFERENCES

NEW PARLIAMENTARY BUILDING

Architect: Michael Hopkins & Partners

The Parliamentary Directorate selected our calcium sulphate L600 AN36 non-combustible system made from 95-97% of recycled materials, which met the specification for the environmentally friendly building. An area of 12,000 m² was installed and also approximately 1,000 m² of our L600 AN30 panels with a factory bonded stone finish.

BP SUNBURY

Architect: David Leon & Partners

The architect specified our L600 FD-G Floor & More system as it provided a sealed cavity floor. This allowed for all the services to be installed within the void with the added benefit of sheet vinyl laid directly on the surface. We also installed our L600 ANB30 non-combustible system in the atriums, with a factory bonded technical stone.

DEBENHAMS

We have supplied and installed in excess of 7,000 m² in 15 new build stores. In some stores our L600 ANB30 non-combustible system was chosen, with a factory bonded ceramic finish and in others a woodcore panel with a factory bonded Amtico finish. Both provide very high sound reduction and total flexibility.

HSBC

Architect: Foster & Partners

Our L600 ANB30 non-combustible system with a factory bonded Impala Granite was specified in an area in excess of 500 m² within the Director's Suites.

We also supplied and installed about 1,000 m² of our L600 AN40 non-combustible system in the Gymnasium and then installed a sprung floor on top with parquet finishes.

 

CAT CAMBRIDGE

The client selected our L600 ANB30 non-combustible system with a factory bonded Mirage ceramic finish for the newly designed reception area within their heaquarters.

LEHMANS

Architect: Swanke Hayden Connell

This high profile client chose our L600 ANB30 Calcium sulphate system with a factory bonded natural marble tile, over an area in excess of 900m².

SCIENCE MUSEUM
WELLCOME WOOLFSON BUILDING

Two types of finish were specified for two areas in this public building. The Nortec S36ST calcium sulphate panel with factory bonded natural bamboo and also a reconstituted stone finish were installed.

SWIFT HORSMAN

We have supplied and installed in excess of 10,000m² of our Floor & More calcium sulphate interlocking system in the public areas of 8 major new build projects in London.

MANCHESTER CIVIL JUSTICE CENTRE

Our Floor & More system has been installed in various public areas and Judges areas.

LINCOLN AND COUNTY MUSEUM.

The specification called for an oak finish in two galleries within the museum and we supplied and factory bonded this to our Nortec S30ST calcium sulphate panels.

WOLVERHAMPTON ART GALLERY

Our products have been selected for this high profile gallery. Our Nortec S30ST calcium sulphate system will be used with a factory bonded smoked oak parquet.

J B SAXTON

Saxtons have specified our floor systems for 5 years over a wide spectrum of projects, from small computer rooms to a major fit-out project of over 8,000 m².

BARCLAYS

Barclays Finance Services required a raised floor system that would allow a fully loaded fork lift to be used on it. After testing the market, they chose our L600 WSB system, supported by steel beams and with a factory bonded Marmoleum.

ROYAL OPERA HOUSE

Architect: BDP

The architect specified our L600 AN36 non-combustible system for the chorus rehearsal rooms. It was installed to various levels, from 150mm to 1.8 metres.


Click the above image for enlarged view.
[ Services ] [ Technical Specifications ] [ Project References ] [ Home ]
T: +44 (0)20 7954 9900
F: +44 (0)20 7954 9901
jo.mchugh@lindner-group.com
www.lindnerplc.co.uk Registered office: New Loom House, 101 Back Church Lane, London, E1 1LU
Reg.No 791017 VAT No. 112 1194 26
Lindner plc is a public limited company registered in England and Wales

Email: andrew.hudson@lindnerplc.co.uk