For more information regarding Lindner walls and suspended ceilings, please click HERE or the logo below.
Opens a new browser window.

     

Click the above image for enlarged view.

SERVICES.

In August 2005, Goldbach Norit Flooring Ltd merged with Lindner PLC.

With unlimited technical support from the Lindner Export Department in Germany, we aim to exceed the expectations of our clients.

We can provide a complete project package to include planning, design assistance, installation, attendance, maintenance and after care services.

Alternatively, we have access to a large range of traditional UK manufactured products on a supply only basis for refurbishment projects and carry some stocks of alternative systems.

Lindner PLC. systems provide many benefits to end users. Over the years we have found that, within their design, new or refurbished buildings need practicality and flexibility in the use of available space.

Access flooring is a crucial element that literally becomes the foundation on which the working environment is defined. Our flooring systems satisfy the demands of accessibility, durability and strength with added benefits of:

  • FIRE RESISTANCE – class O non-combustible certified up to class F60.
  • ENVIRONMENTAL – calcium sulphate panels manufactured from recycled materials that have won several awards, including the IRB seal from the Institute for Construction Biology,Rosenheim. Award winning safe production processes that utilise residual materials, including the water used during manufacture.
  • NOISE REDUCTION - dense panel material coupled with high compression techniques, give sound absorbency rates of up to 60dB.
  • CORROSION FREE - access floor systems that are without steel, eliminating possible corrosion and do not require separate earthing.
  • DIMENSIONS - fine tolerances of +/- 0.2mm are achieved during manufacture to give snag free installation.
  • PRE-BONDING - due to material stability and dimensional accuracy, all panels can be pre-bonded, using materials such as carpet, ceramic, natural timbers, vinyl and stone.

The principle of bonded specialist finishes is to maintain a service void for cables, conduits and trunking as opposed to re-routing them through the ceilings or behind walls.

This method can be very cost effective and provides total flexibility to the end user should any configuration changes be required in the future.

In areas such as marble or wood block entrance lobbys, the problem of routing the services round the material laid directly on the sub-floor is eliminated. Re-allocating the space at a later date can be completed quickly and at a considerably lower cost.


Click the above image for enlarged view.

 

[ Services ] [ Technical Specifications ] [ Project References ] [ Home ]
T: +44 (0)20 7954 9900
F: +44 (0)20 7954 9901
jo.mchugh@lindner-group.com
www.lindnerplc.co.uk Registered office: New Loom House, 101 Back Church Lane, London, E1 1LU
Reg.No 791017 VAT No. 112 1194 26
Lindner plc is a public limited company registered in England and Wales

Email: andrew.hudson@lindnerplc.co.uk